01 Apr, 2010
TransProCon

 

Discharge and oncarriage of Siemens Power equipment with 2 HL 110 MT from Norrköping to Guanta. Destination San Joaquin in Venezuela. Permission for the heavy lift transport is suddenly halted by the authorities for unknown reasons.
 
The sensitive Turbine must be placed in the port and cooled for 5 months before final delivery permission is granted.
 
Despite difficulties, TransProCon succeeds  in keeping the equipment safe during the waiting time and are finally able to deliver the 2 heavy lifts to the Site.